ATOMIK How-To Series #5 Attaching Screw-On Holds to Concrete ADVANTAGES & DIFFERENCES OF SCREW-ON VS BOLT-ON Determining the value of permanent hold locations.
| |||||||
ATOMIK - Attaching Screw-On Holds Directly to Concrete (5.2) MOUNTING YOUR HOLDS DIRECTLY TO MASONRY Using a hammer drill and 5/32” Tapcon bit, locate and drill the first hole. | |||||||
ATOMIK - Attaching Screw-On Holds Directly to Concrete (5.3) Lightly tighten down the first Tapcon screw so you can rotate the hold to the desired orientation. If the screw starts to bind, STOP! Back the screw out. Clean the hole properly, and confirm the depth of the hole is appropriate for the length of the screw being used. | |||||||
ATOMIK - Attaching Screw-On Holds Directly to Concrete (5.4) Once you have the hold oriented the way you want, drill the remaining screws, and tighten all screws. |